Oriole Design Tech Solutions was responsible for 3D model, shop drawing and prefabrication drawing preparation of plumbing. Clash coordination with other services.
As this was an amusement facility, so the building was not in a regular shape. Moreover, due to the involvement of multiple trades and multiple changes involved coordination was a real challenge for this project. We have reviewed each changes and issues precisely and in case of any mismatch or conflict we have raised many RFIs with intelligent and logical solution.
Project Gallery
Project Categories: Infrastructure
Specifications
Building Type
Amusement Park
Trades Covered
3D Modeling, Model Validation, Shop Drawing
Scope of Work
LOD 350
Project Timeline
22 Weeks
Resources Used
5 Engineers
Challenges Addressed
We have raised around 39 RFIs for missing information, constructability issues, etc.
Software Used
Revit
Navisworks


